-
GuillermoExcellent! Fast delivery! I like to work with you again! -
Perus ColetteIt is my pleasure to do the business with LiFong,they always do the best for us. -
Robin SeifertI like the products and service provided by LiFong. They really take our interest into consideration. -
SjakThat's true we enjoy doing business with you. -
Kelly MarshLiFong is one of our desired vendors in China -
रायमुंड शेन्कोउत्पाद की गुणवत्ता, प्रतिस्पर्धी मूल्य, हमेशा हमारे प्रमुख आपूर्तिकर्ताओं में से एक
Custom Aluminum Fin Copper Pipe Heat Sink For LED Light / Stage Lamp
नि: शुल्क नमूने और कूपन के लिए मुझसे संपर्क करें।
Whatsapp:0086 18588475571
WeChat: 0086 18588475571
स्काइप: sales10@aixton.com
यदि आपको कोई चिंता है, तो हम 24 घंटे ऑनलाइन सहायता प्रदान करते हैं।
x| प्रमुखता देना | copper heat sink,pin fin heat sink |
||
|---|---|---|---|
Custom Aluminum Fin Copper Pipe Heat Sink For LED Light / Stage Lamp
Quick Details:
Precision Copper Pipe Heat SInk
Aluminum Fin Heat Sink with Copper Pipe
Materials: Pure Copper C1100 Strips, Purity over 99.5%
Depend on customer's requirements
Description:
Aluminum Fin Heat Sink with Copper Pipe
300W Big Power Copper Pipe Heat Sink
Copper Pipe Heat Sink for Stage Lamp
Heat Sink With Copper Pipe For Stage Lamp
Application: Stage Lamp
Specification:
| Overall Dimension | L256*W240*H103mm |
| Fin Dimension | 220mm in Dia |
| Aluminum Fin Thickness | 0.5mm |
| Fin Quantity Per Row | 20 pcs |
| Copper Tube | 8mm in Dia |
| Copper Tube Q’ty | 8pcs |
| Aluminum Bottom Board Thickness | 7mm |
| Tube Quantity | 6pcs |
| Part Weight | 1.9kgs |
| Material |
Pure Copper C1100 Strips, Purity over 99.5% (Standard: JIS H3250-2006); Pure Aluminum Board A1060 Purity Over 99.6% .(Standard: GB/T3880-2006). |
Facility:
Automatic Tube Forming Machining
![]()
Overflow Welding/Drying Machine
Processing Technic:
1. Aluminum Fins: Progressive Die Stamping
2. Aluminum Board: Extrusion + CNC Machining
3. Copper Tube Forming : Automatic Tube Bending+ Burn into Tip Ends.
4. Aluminum Board Nickle Plated, Copper Fin Passivate (Insulation, Oxidation and Corrosion
Resistance).
5. Assembly: Automatic Fin Wearing/Assembly, then Fixed by Overflow Soldering and
Screw/Rivet Combination.
6. Quality Check
7. Packing
Advantages:
1. Professional Research and Design Team, Strong & Automatic Equipments: Progressive
Stamping, Automatic Tube Bending Machine, Automatic Fin Wearing Machining
2. Strict Quality Control in Each Process and Finish Product Quality Control
3. Short Delivery Lead Time: 15-30 Days
4. Optional For OEM or ODM
5. Comprehensive After-Sale Service, Quick Responses For Daily Communication

