-
GuillermoExcellent! Fast delivery! I like to work with you again!
-
Perus ColetteIt is my pleasure to do the business with LiFong,they always do the best for us.
-
Robin SeifertI like the products and service provided by LiFong. They really take our interest into consideration.
-
SjakThat's true we enjoy doing business with you.
-
Kelly MarshLiFong is one of our desired vendors in China
-
रायमुंड शेन्कोउत्पाद की गुणवत्ता, प्रतिस्पर्धी मूल्य, हमेशा हमारे प्रमुख आपूर्तिकर्ताओं में से एक
Professional Aluminum LED Flood Light Housing Heat Sink Powder Coating

नि: शुल्क नमूने और कूपन के लिए मुझसे संपर्क करें।
Whatsapp:0086 18588475571
WeChat: 0086 18588475571
स्काइप: sales10@aixton.com
यदि आपको कोई चिंता है, तो हम 24 घंटे ऑनलाइन सहायता प्रदान करते हैं।
xMaterial | Aluminum Alloy | Product Type | LED Flood Light |
---|---|---|---|
Power | 30W/50W/70W/100W/120W/150W/200W | CRI | >75Ra |
Color Temp | 3000K-7000K | ||
प्रमुखता देना | एलईडी रोशनी के लिए एल्यूमीनियम आवास,एल्यूमीनियम एलईडी आवास,एल्यूमीनियम एलईडी प्रोफ़ाइल आवास |
Professional manufacturer Aluminum Led Housing LED Flood Light Led Heat Sink Powder Coating Finishing
Specification:
Model No: | LF-SE2000 |
Power: | 30W/50W/70W/100W/120W/150W/200W |
LED: | 3030 (Recommend) |
Craft: | Die Casting |
Surface Treatment: | Powder Coating |
Material: | Aluminum Alloy |
Dimension (mm): | 189x199x71.4mm (30W) |
Application: | Widely used at gymnasiums, airport, dock, huge building, advertising board, area lighting etc. |
Weight: | 0.95kg/2kg/2.05kg/4.3kg/4.8kg/5.9kg/7.7kg |
Notes: | Electroplating This item is only for reference only, not for sale; We only produce custom Models per customer's prints. |
Material:
Long lifespan, can reach 50,000 hours
No strobe/UV/IR radiation
fashion modern,Anti-corrosion coating surface,durable in use.
Application
Main road/street/park/square/path/subway/highway
Advantage
1)Fin-type interlock thermal management.
2)Powder coating, corrosion resistance,Ingress Protection IP65.
3)Up to 50,000 hours average life
4)Easy to install and maintain
Packaging and delivery:
- Packaging detail: EPE or paper for each piece, then carton box outside, or as per customer's requirement
- Delivery lead time detail: 15-30 days